top of page

Investing in the Future

About

Powerhouse Capital Partners 
Solar Panels

1

Industry Leader

Powerhouse Capital Partners makes strategic investments as an equity provider or JV Partner for large-scale data center projects utilizing behind the meter prime power and renewable energy in the USA.

2

Scalability

Specializing in data center, solar and wind projects & energy storage (BESS), we are dedicated to accommodating  "Immersion" & "DLC" cooling technologies that drive sustainable energy solutions while incorporating designs that provide scalability & expansion.

3

Sustainability

Our commitment to renewable energy and environmental preservation drives us to support initiatives that make a positive impact on the planet and society.

Empower

Discover how our data center, solar/wind/BESS storage solutions and adding NG generators delivering prime power, can revolutionize your business operations. Harness the power of hybrid power solutions utilizing utility scale NG turbines combined with sun and wind to drive efficiency and sustainability for your company. Let us guide you towards a  more cost efficient and greener future.

Solar Panels

Our Business Model

We DEVELOP SCALABLE DATA CENTER SITES AND INTEGRATE Renewable Energy TO MAXIMIZE RETURNS

01

Eco-Friendly Design

Powerhouse Capital Partners designs and delivers greener, more sustainable energy solutions accommodating  immersion & DLC cooling technologies to large scale data centers that result in a lower cost of energy "LCOE" and lower intermittency than grid interconnections across the US.

02

Complete Solution

Powerhouse Capital Partners understands intermittency and capacity factors of solar/wind farms, integrated with BESS systems and delivers prime power solutions for all sizes of data centers including hyperscale.

03

Advanced Functionality

Sourcing co-location of data centers with solar & wind farms, BESS and powered by prime power plants with renewable energy generating assets, delivering electrical energy costs to Colo operators & hyperscaler's at competitive rates.

04

Superior Tech

BESS Energy storage co-location installation integrated into projects to deliver seamless uninterrupted power supply for minimum Uptime Tier III rating.

deck pic downtown lit up.jpg

Investing in the future

Solar part 1_edited.jpg

Partnership

commercial renewable energy.jpg

Sustainability

battery solar 1.jpg

Renewability

Natural Gas powered generators (100-300MW) co-located on site to provide continuous electricity for High Performance Computing (HPC) & AI.

2025 designed data centers (accommodating immersion and/or direct-to-chip waterless, liquid cooling technology) with PUE as low as 1.04

Services

Powerhouse Capital Partners is actively sourcing DATA

CENTER projects, adding utility scale prime Power Plants

combined with renewable energy Solar/Wind/bess assets,

co-located on the same site.

01.

Designing and delivering stand-alone or co-located data centers for 2025 designed DC's to accommodate:​

  • Immersion and/or Direct to Chip Liquid Cooling

  • Closed Loop System

  • Zero Water Evaporation

  • Reduced Water Usage

  • Enables High Rack Density

  • Lowest PUE ratings

  • Aggressive WUE

  • Sustainable Approach

  • Scalable to accommodate future increase in kW/rack density (this point can not be understated)

​

​

​

02.

Design & Construct DC's: 

  • Complete Data Center Site Selection & Location Analysis:

  • Fiber - Long Haul & Short Haul Metro Access

  • Grid - Available Power with a date certain:

  • Sub-Station Capacity:

  • Behind the Meter NG Prime Power  Plant:

  • Perform DD

  • NG availability

  • Design, construct commission and deliver keys to the front door when complete.  

03.

End to End Solution for Data Center Investors, Capital Providers & Partners, Hyper & CoLo Operators & PPA Off-Takers.

04.

Provide equity & debt financing along with PPA's.

Design & construct  current 2025 data centers accommodating  immersion and/or Direct Liquid Chip (DLC) cooling  technologies resulting in significantly less water usage, lower WUE, lower PUE, LCOE and lower compute cost/rack.

05.

Data centers co-located with BESS, renewable power sources, NG behind the meter power plants for 100-300MW projects across the US integrating  stakeholders objectives with aggressive development timelines to maximize ROI.

data center 5.png

Contact US

Reach out to open discussions on working together.

Frank Gallagher  SIOR - (RL) Landman

Managing Member

Powerhouse Capital Partners LLC

©2035 by Powerhouse Capital Partners LLC. Powered and secured by Wix

bottom of page